| Installation Guide |
| Fitment to: Left hand side
Fitting time: Approximately 120 minutes
Special Tools:
- 95mm holesaw
- Step drill
- Air hacksaw
|
|
1
|
Remove:
- Left hand front wheel.
- Left hand front wheel arch liner.
- Boom bottle from behind guard.
- Indicator from guard.
- Air cleaner assembly, including pre-spinner.
|
|
2
|
Tape template to upper rear corner of left hand guard. With a felt tip pen, mark out all holes, including new indicator position. Drill a 4mm pilot hole for each hole position. Drill main hole to 95mm using the holesaw (2 holes required). Drill the remaining five holes to 16mm using the step drill. |
|
3
|
Using the air hacksaw, join the two 95mm holes together. Also cut out the new position for the indicator. De-burr and paint all holes. |
|
4
|
Remove door sealing rubber from “A” pillar. Install mounting studs to Snorkel body and place Snorkel on guard. Verify position of upper mounting bracket in relation to standard trim screw (see drawing for details). Trim windscreen moulding to clear upper mounting bracket (see drawing for details). Install upper mounting bracket and mark out the remaining two holes. Remove bracket and drill a 4mm pilot hole. Remove trim and drill holes to 8mm. De-burr and paint holes. Insert plastic plugs and refit trim. Install upper mounting bracket and refit door sealing rubber. |
|
5
|
Place foam body gasket onto Snorkel and position Snorkel on guard, fasten Snorkel using necessary hardware, including rubber washers (see drawing for details). |
|
6
|
Fit connecting duct to Snorkel, refit air cleaner assembly minus the pre-spinner. Smear a small amount of silastic in connecting duct at air cleaner side. Fasten all hose clamps. |
|
7
|
Refit indicator lens and wheel arch liner. |
|
8
|
Install air ram and fasten. |
| Warning: Do not overtighten Snorkel mounting nuts. |
| WARNING: IT IS THE INSTALLERS RESPONSIBILITY TO ENSURE ALL CONNECTIONS ARE WATER TIGHT. |